System Analysis and Design

136 views 9:38 am 0 Comments July 31, 2023

Unit ISY2001 System Analysis and DesignMarketing Research and Data Analysis
Assessment Type Case Study Assessment 3 Number Assessment Case Study Weighting 20%
Alignment with Unit and Course
Due Date/Time
Assessment Description
Detailed Submission Requirements
Misconduct
Late Submission
Special consideration
Unit Learning Outcome Graduate Attributes Assessed
ULO 1: Describe and discuss concepts and principals of systems analysis and design ULO 2: Examine the stages of the systems development life cycle ULO 3: Apply basic diagrammatic modelling tools to systems analysis and design
Week 10 31th January 2020 via Moodle before 9 PM
GA 1: Communication GA 4: Critical Thinking and Problem Solving GA 6: Flexibility
You are required to design a system that can perform the above activities and maintain a database containing data relevant to those activities. Carry out “process modelling” and “data modelling” to achieve this purpose.
Content and Structure: You are required to submit a report of at least 800 words excluding references.
You may choose a case study from the prescribed text book. You will need to get an approval from the lecturer before they proceed.
Tasks
• Provide a justification of why this system needs to be developed and ensure that you are professionally convincing to senior management. • Provide a description of the business case and justification about the business benefits from implementing this system. • Describe the project scope and provide a brief cost and schedule analysis.
• Create a Use Case diagram to show the actors and a sequence diagram for at least one of the processes • Develop data flow diagram (DFD level 0 and Context Diagram with at least 1 process exploded). • Prepare entity relationship diagram, to model the data requirement relevant to this system. Make use of Crow’s foot notations in ER diagram. Indicate Primary and Foreign keys clearly. Make sure the data is in 2nd Normal Form. • Create 3 screen interfaces a (main menu, an input screen and a report). • Create a Gantt chart to show the project schedule in Excel or MS Project
The marking will be based on the design; it is not necessary to implement the system.
• The assessment will be submitted through Turnitin via your unit page on Moodle. • Turnitin is plagiarism software, which will identify if you have copied information and included it in your assessment. • Copying information from others (i.e. websites, partner company information, or other students etc.) without the acknowledging the author is classified as misconduct. • Engaging someone else to write any part of your assessment for you outside of the group work arrangement is classified as misconduct. • To avoid being charged with Misconduct, students need to submit their own work and be able to explain the program logic and its working. • The AIH misconduct policy and procedure can be read on the AIH website (https://aih.nsw.edu.au/about-us/policies-procedures/).
• Any assessment submitted past the specific due date and time will be classified as Late. • Any Late submission will be subject to a reduction of the mark allocated for the assessment item by 5% per day (or part thereof) of the total marks available for the assessment item. A ‘day’ for this purpose is defined as any day of the week including weekends. Assignments submitted later than one (1) week after the due date will not be accepted, unless special consideration is approved as per the formal process.
• Students whose ability to submit or attend an assessment item is affected by sickness, misadventure or other circumstances beyond their control, may be eligible for special consideration. No consideration is given when the condition or event is unrelated to the student’s performance in a component of the assessment, or when it is IFIRILIWWW11111118
• Cti iflanfe mnrthtinn fnr ennninl nnneirinrntinn mile+ ei 11,1,4 41-■ra fnrrn tAtithin 1 riotte of Oho

Tags: , , , , , , , , , , ,