ENG233 Internet of Things (IoT) Assignment

176 views 9:30 am 0 Comments November 19, 2023

Problem Definition: (15 marks)
Question 1
Define at least FOUR (04) operational challenges while operating and managing earth-moving equipment at a construction site that the SBC digitalization team shall address (as-is situation, in the absence of SAMS). Estimate the impact of those problems on sustainability goals (SDGs). Propose a prioritization matrix/rubric to rank identified problems from high to low in priority of importance. (Provide a table with quantitative and qualitative reasons, a prioritization rubric, and description.)
(15 marks)

Workflow Design (15 marks)
Question 2
Plan and describe the improved operational workflow of managing earth moving equipment to reduce the operational wastes. Propose the SDGs that can be achieved by addressing those wastes and map them against the corresponding SDG#. (Provide a workflow diagram, map SDGs on workflow, and description.)
(15 marks)

Tags: , , , , , , , , , ,