Cost Management for C&S Works Assignment

122 views 7:33 am 0 Comments October 17, 2023

Question 1
With reference to Figure Q1.1,

(a) Prepare a take-off list with the corresponding CEMS clauses and unit of measurement for measuring the excavation and reinforced concrete work.
(10 marks)

(b) Apply measurement technique to take off quantities for the excavation and reinforced concrete works

 

Question 2
(a) Compare the difference between a trial pile and a working pile and the different type of static load tests applied to them.
(10 marks)
(b) With reference to Figure Q2.1, prepare a take-off list with the corresponding CEMS clauses and unit of measurement for measuring reinforced concrete bored piles including reinforcement.
(10 marks)
(c) With reference to Figure Q2.1, apply measurement technique to take off quantities for the reinforced concrete bored piles.
(15 marks)
(d) With reference to Figure Q2.1, apply measurement technique to take off quantities for the reinforcement work.

 

Question 3
With reference to Figure Q3.1, identify the scope and interpret the drawing.
(a) Identify the relevant CEMS rules relating to sub-heading and classification
requirements and explain how they are applied to the measurement of the steel roof trusses which do not form a major part of the structure. (10 marks)
(b) Apply measurement technique to take-off quantities for the steel roof truss. (15 marks)

 

Tags: , , , , , , , , , ,