Advanced Project Management

102 views 6:31 am 0 Comments August 19, 2023

OPS 936 – Advanced Project Management Week 2 / Session 1b
OPS 936 – w2-s1b – Technical support.docx Mar-22 1
Construction
ISO 9001:2015

b. Cândido et al.,
2016
Cândido, C.J.F., Coelho, L.M.S., Peixinho, R.M.T. (2016). The financial
impact of a withdrawn ISO 9001 certificate.
International Journal of
Operations and Production Management
. Vol.36, Iss.1; pp.23-41.
c. American
Society for
Quality (ASQ)
https://asq.org/quality-resources/iso-9001
d. Okudan and
Budayan, 2021
Okudan, O., Budayan, C. (2021). Reasons for Performance Differences
among ISO 9001:2015–Certified Construction Companies in the
Perspective of TQM Elements. Journal of Management in Engineering.
Vol.37, Iss.5; p.4021050. DOI: 10.1061/(ASCE)ME.1943-5479.0000952.
e. Psomas and
Antony, 2015
Psomas, E., Antony, J. (2015). The Effectiveness of the ISO 9001 Quality
Management System and its influential critical factors in Greek
manufacturing companies.
International Journal of Production Research.
Vol.53, Iss.7; pp.2089-99.
f. Salgado et al.,
2016
Salgado, E.G., Beijo, L.A., Sampaio, P., Mello, C.H.P., Saraiva, P. (2016).
ISO 9001 certification in the American Continent: a statistical analysis and
modelling.
International Journal of Production Research. Vol.54, Iss.18;
pp.5416-5433.
g. Su et al., 2020 Su, H., Kao, T., Linderman, K. (2020). Where in the supply chain network
does ISO 9001 improve firm productivity? European Journal of
Operational Research. Vol.283, Iss.2; pp.530-540.
h. Wilson and
Campbell, 2016
Wilson, J.P., Campbell, L. (2016). Developing a knowledge management
policy for ISO 9001: 2015.
Journal of Knowledge Management. Vol.20,
Iss.4; pp.829-844.

 

a. Brooks et al.,
2021
Brooks, T., Gunning, J.G., Spillane, J.P., Cole, J. (2021). Regulatory
decoupling and the effectiveness of the ISO 9001 quality management
system in the construction sector in the UK – a case study analysis.
Construction Management and Economics. Vol.39, Iss.12; pp.988-1005.
DOI 10.1080/01446193.2021.1983186.

OPS 936 – Advanced Project Management Week 2 / Session 1b
OPS 936 – w2-s1b – Technical support.docx Mar-22 2

OPS 936 – Advanced Project Management Week 2 / Session 1b
OPS 936 – w2-s1b – Technical support.docx Mar-22 3

Tags: , , , , , , , , , , ,