1
PRACTICAL PRESENTATION
QUESTIONS
Please prepare a presentation to take a maximum of 15 minutes.
• How would you select the correct cable size for this circuit?
• Identify the design elements required to advance this scheme to construction
(Consents, Technical Design, Electrical Design, et cetera)
• What project management risks would you associate with this scheme?
• What safety risks would you associate with this scheme?
• Identify a proposed programme for the scheme, splitting design and construction.
• Highlight the programme critical path.
• Propose a high-level financial estimate.
• Describe the process to work on & close a highway.
(Note- Consider this with UK Standard)
2
CIRENCESTER TO WHITEWAY 33KV FFC
CABLE REINFORCEMENT
3
DETAILS
• This is a failing 33kV Fluid Filled Cable (FFC) Circuit.
• This is a 31MVA circuit.
• This is a 0.13km section of circuit two connection points. To
the west is a 33kV joint position and to the east is an overhead
line termination pole.
• We are replacing the existing FFC circuit with an XLPE circuit.
• This is an emergency scheme to be completed by September
2023. Human Computer Interaction