Project Management Risk

140 views 9:38 am 0 Comments June 20, 2023

1) Mention UK standards as requested.
2) You have to consider the factors for choosing the cable size but it is expected to show calculations to select correct cable size.
3) Technically cover the point of *Identify the design elements require to advance this scheme*
4) Check all points in *Project Management Risk*
*Safety Risk*
*Identify the proposed programme for the scheme. And How you will split, mention in the details*

*critical path*

*The calculations of financial estimates should be in GBP and also its base less, and it should be current market rate*

*complete process to work on and close a highway*

Note- I need the reference you have quoted.

Please go through the 3rd page of task which I have submitted, you have to incorporate the same in PPT.

This case study for some area in the UK, so considering this all you have to modify it.

 

Please read this as well may be you can get some ideas. *projects vary from the replacement of existing assets due to condition or increased load growth to the installation of new substations up to 132kV. In this role you will be:

– Developing detailed project designs that can be consented and safely constructed in compliance with SSEN standards and specifications.

– Producing or verifying design calculations, checking and approving designs to ensure the most appropriate and cost-effective solutions are selected to meet customer and regulatory requirements.

– Considering stakeholder views within the design development phase of the projects.

– Specification of plant through completion of order schedules for primary plant items, which will require an understanding of the plant items and their interaction.

– Supporting the team by providing engineering or technical advice relating to the project designs.

– Coordination of pre-construction surveys, stakeholder engagement and agreement of project scope, producing pre-tender documentation including programmes and financial forecasting, and ensuring compliance with the Construction (Design and Management) Regulations 2015.*

#plagiarismfreework

#assignmenthelpaustralia

#assignmenthelp

#assignmentexpert

#assignmenthelpuk

#assignmenthelpusa

#assignmenthelper

Leave a Reply

Your email address will not be published. Required fields are marked *