Necessity for efficiency improvement in construction industry

165 views 8:56 am 0 Comments May 26, 2023

1
PROCESS IMPROVEMENT
TOPIC 3
Griffith University
Dr Rodney Stewart
Necessity for efficiency improvement
in construction industry
Gross Domestic Product
(GDP) of a Westernised
Economy

Construction industry out
contributes
8-10%

 

A 10%
in construction
performance

improvement 2.5% increase in GDP
Current Construction Practice
Traditional delivery
system
Fragmented industry
Conflicting interests
Unsatisfactory
performance
Much needed
improvement

2
Business Process Re-engineering
the fundamental rethinking and radical
redesign of business processes to achieve
dramatic improvements in critical,
contemporary measures of performance
”.
Hammer & Champy 1993
BPR BPR
Characteristics of Re-engineering
Re-engineering
Fundamental Radical
Dramatic Process
BPR BPR
Characteristics of Re-engineering
AFundamental
n Fundamental look at what is the core business
of a company
Why are we here?
Why do we operate the way that we do?
n Understand the nature of their business
BPR BPR
3
Characteristics of Re-engineering
ARadical
n A considerable departure from the usual or
traditional approach
“How can we redesign the process so that
waste is eliminated?”
Not “How can we minimise materials
wastage on site?”
e.g. Lean construction process-decrease waste in
both the design and construction process
BPR BPR
Characteristics of Re-engineering
ADramatic
§ A successful re-engineering strategy should
be quantum leap forward
§ Process of reengineering never cease
§ Constant and incremental
Companies benefits from reengineering:
§ In deep trouble
§ Trouble is brewing ahead
§ Keen and aggressive
BPR BPR
AProcess
nPrimary concern of re-engineering
Redesigning of a process
NOT redesigning the organisational
structure of departments or units
nProcess redesign
Fundamental
Radical
Dramatic
Characteristics of Re-engineering
BPR BPR
4
Characteristics of Re-engineering
Risk
Impact / degree of
improvement
Process improvement/
“tidying”
Process improvement/
“tidying”
Process Redesign Process Redesign
Process
Re-engineering
Process
Re-engineering
BPR BPR
Existing flows of people,
information and materials are
mapped and streamlined by
identifying opportunities for
eliminating dead-ends, ad hoc
activities and duplication
Find short-cuts in the process,
identify
more user friendly way
Re-establish
process to meet the
business objectives
Process Re-engineering
n The re-engineering philosophy calls for
improving the process through:
E Reconfiguring traditional tasks
E Simplifying operations
E Reducing number of specialists
E Using a multi-skilled work force
BPR BPR
Re-engineering Methodology
The initial stage
AContext
Cultural change
Strategic decision of political nature
Changing attitude, behaviour and point of reference
Top down approach –initiate at the highest level
BPR BPR
5
Re-engineering Methodology
The initial stage
A Organisational structure
†Leader –CED or MD
†Process owner –head office level (not site or
project level)
†Steering committee –small group of senior
management
†Reengineering team –multi-disciplinary group
(CM & IT)
†Reengineering champion –individual responsible for
developing reengineering techniques and tools within
the company and for achieving synergy across different
re-engineering projects.
BPR BPR
Re-engineering Methodology
The planning stage
Identify Objectives
Develop indicators of
success
Consider alternative
strategies
Develop and select
programmes
Resolve customer needs and business
objectives
Develop indicators of success
Process
re-engineering
Continuous
improvement
or
Select
§BPR –embark fundamental change
§Programme of finetuning
BPR BPR
Re-engineering Methodology
The implementing stage
Effective management of fundamental
change
Human factors: feelings, attitudes, values,
behaviour, commitment and personal
qualities (open minded)
BPR BPR
6
Reengineering Methodology
The implementing stage
§ Several jobs are combined into to one
§ Workers makes decisions
§ The steps in the process are performed in a natural order
§ Process have multiple versions
§ Work is performed where it makes the most sense
§ Checks and controls are reduced
§ A case manager provides a single point of contact
§ Hybrid centralised / decentralised operations are prevalent
BPR BPR
Construction Process
Re-engineering
“A customer-focused approach to
progressively develop an integrated
project delivery process focusing on
optimising predictability and enhancing
the value of the final product”
CPR CPR
Construction Process Re-engineering
n Driving force
A customer- and market-driven change initiative
Clients create and maintain the momentum through CPR
implementation
n Major players
Every project participants
n Features
Unambiguous routes, rules and roles being
communicating across all level of the project
CPR CPR
7
Construction Process Re-engineering
§ Positive involvement of customers at the early
project stage
§ Strong commitment by designers, consultants
and contractors
§ An effective communication cycle
§ Quality assurance
§ Innovation
§ New approaches to improve construction output
CPR CPR
Key principles of a successful
implementation of CPR
§ Specify and realistic objectives
§ A well defined project scope
§ Explicit communication to help capture customer
requirements and translate them into
implementation plans
§ Flexibility embodied in the process
§ Win-win incentives
§ Enduring working relationships
§ Performance measurement
§ Automation and information technology
CPR CPR
T40 Research Project
Reengineering study in the Australian
construction industry
Objective: reduction process time by 40%
Team: 3 major contractors, 2 major
services suppliers, 2 key consultants, and
CSIRO (
the Australian national research and
development organisation
).
Motorola (USA) as the facilitator
CASE CASE
8
The T40 Project
n T40 provides a new look to current
delivery system
n T40 promotes re-engineering the process
to achieve
Substantial reduction in time
Substantial improvement in cost & quality
CASE CASE
Proposed T40 Processes
nAgreed common goals
nRe-engineered activities
nWorkforce commitment
nPartnering with clients
nElimination of tendering phase
CASE CASE
Traditional process hierarchy
CASE CASE
Customer
Architect
Contractor
L1
subcontractor
L2
subcontractor

L1
subcontractor
L2
subcontractor
L1
subcontractor
L2
subcontractor
L1
subcontractor
L2
subcontractor

Need
perception
Goals
fragmentation

9
T40 solutions
CASE CASE
Customer
Architect
Structural engineer
Contractor
L1 subcontractor
L1
subcontractor
L2
subcontractor
Need
perception
Goal focus
PILOT STUDY
Study Nature
Typical tenancy fitout work package in office building
Objectives
Examine current practice in terms of sequence, skills,
equipment, etc.
Apply new concepts to highlight the potential for time
reduction.
Develop guidelines for the application of the reengineering concept.
CASE CASE
Study Findings
§ Potential savings of 25% of the overall time duration.
§ Possibility for more time savings through process
redesign.
§ Major rework causes are design changes and quality
deviations.
§ Larger work modules can lead to more time savings.
§ Minimum co-ordination exists between trades.
CASE CASE
10
Study Recommendations
Reduce the share of non value-adding activities
Increase output value
Reduce variability
Reduce cycle times
Simplify the process
Increase output flexibility
Increase process transparency
Focus control on the whole process
Build continuous improvement
Balance flow and conversion improvement
Benchmark
CASE CASE
Information Technology & Construction Process
Re-engineering: A Recursive Relationship
What is Information Technology?
What is Construction Process Re-engineering?
Two (2) different approaches to CPR
an “in-house”operation; or
an agent to change the way business is
conducted
IT IT
Current Status
Acknowledging the
role of information
flow in construction.
IT is a major enabler
of Process Reengineering
IT IT
11
Recursive Relationship
Information Technology
Capabilities
Construction Process
Re-engineering
How can IT support re-engineered processes?
How can processes be improved utilizing IT?
IT IT
Utilizing IT to Re-engineer
The need to Change
Each process has a
structure and
boundaries
Re-engineered
operations should be
designed around their
outcome.
IT IT
Utilizing IT to Re-engineer
Business
Strategy
Existing
Process
(A)
Re-engineered
Process
Innovations
Existing Enabler
Process
(B)
Existing
Process
(C)
IT
Capabilities
IT IT
12
IT as Enabler
• Selected IT applications
EDI
Integrated Database
Shared Database
CAD Conferencing
• IT is rarely effective
without simultaneous
cultural and
organisational changes
IT IT