Integrated Design Exercise

106 views 11:03 am 0 Comments June 8, 2023

Integrated Design Exercise
Secondly. the Wish criteria process will occur after the Must criteria. thes6 criteria MII engage different engineering services. hydrogeobgy services and other specialists that have knowledge about sites (Steyn & Buys, 2019b).The following features are the selected criteria for this project.
Location:
Identify an appropriate site for the project is the most important criteria to make sure the successful. First. site should have excellent access to different options of public transportation that provides transportation for the users to a different destination. because some users can’t afford Private transportation. Also. the site should be easily accessible for bringing in the needed equipment for the site (Simpson 8. Wilkerson, 1997a).
Coast:
It’s helpful to find the recent appraisal of the selected site to estimate its cost. the cost of buying the site is the most important considerofion in selecting the properly. Before initiating the search for the site. it must determine whether the site con be bought or can be leased (Simpson & Wilkerson, 1997b).
Hazard:
Identify the vulnerabilities around the area of the selected site to Is them and to develop them, and to make sure the site is free from any potential damage from the natural hazards (Simpson 8. Wilkerson. 1997c).
Integrated Design Exercise
Size:
The size of the site must be larger than the requirement of the building layout. Also, when the .e is significantly bigger than the required size it will be costly. unless there is a future plane to expand the bulking (Simpson 8. Wilkerson. 1997d).
Topography:
The selected site must be located where the drainage system is found. which is easier to connect to.
Land Evaluation & Zoning.
Lond evoluofion is performing on ossessment on the land or site when it used for a specific purpose, which Is PerfOrming and IntarPrefing Oi smelling orld studies of londforms. vegetation. soils. climate and other feature of the lond in order to identify and comparing between different types of land, that is used in terms of application to the objectives of the evaluation (Booth. 19861.
Zoning process is dividing the lond into different zones either residential or industrial. In addition. zoning can arrange the building places, and it can determine whether the permission is granted to build project on the land or not. moreover, zoning con indicate the size and dimensions of the building design according to the size of the land (Lamar. 2015).