Construction Measurement (3 of 4) Advanced Civil & Structural Works

128 views 10:41 am 0 Comments April 27, 2023

Question 1

Interpret Figures Q1.1 to Q1.7 and apply measurement techniques to the following questions.

Specification Notes for Question 1:

  • Reinforced concrete shall be grade 40. Lean concrete shall be grade 15.
  • Formwork shall be of sawn timber for sub-structure works and written timber for super-structure works.
  • The concrete cover shall be 50 mm thick for sub-structure works and 25 mm for super-structure works.
  • Topsoil excavation shall be to a reduced level and deposited on-site in temporary spoil heaps average of 30m away from the excavation works for reuse.
  • Reinforcement for roof beams and roof slab is not to be measured.

Construction Measurement (3 of 4) Advanced Civil & Structural Works

Construction Measurement (3 of 4) Advanced Civil & Structural Works

Construction Measurement (3 of 4) Advanced Civil & Structural Works

Construction Measurement (3 of 4) Advanced Civil & Structural Works

Question 1a

Prepare a take-off list, and unit of measurement and apply relevant SMM clauses for measuring the reinforced concrete structure.

Question 1b

Take off quantities for the sub-structure works.

Question 1c

Take off quantities for the super-structure works.

Question 1d

Take off quantities for the reinforcement works.