7:17
< Back 4 i… ® ®
‘ Federation – University
(N)
Requirements Each individual student is required to select one (1) peer reviewed journal article from the list of four (4) journal articles provided on project management leadership related to the course (see below). Each individual student is required to write a blog critically analysing their selected journal article, including an introduction, summary, analysis, and condusion (approximately 1200-1500 words). The review should be supported by references from the literature, demonstrating wider reading and critical thinking (ppproximately 6-10 references).
In addition, each individual student will be required to review or(L j1 other student’s blog (approximately 100-150 words per review). Reviews should provide a deep analysis of the critique as well as suggesting applications and consequences of the ideas presented.
Sele e (1) of the following articles:
• Norrie, J., & Walker, D. H. (2004). A balanced scorecard approach to project management leadership. Project management journal, 35(4), 47-56. https://iournals.sageoub.com/doi/pdf/10.1177/875697280403500406?casa token.USEztn0Y4 r4AAAAA:GJ3EvcM0atkTT.XJ1SsnHzrrHWSPbOXD99KE•iZFz0f1 CekwbmeB2xH VotLGyt YVzLB5DEyd83sQ
nd, J., Viktorov, A., Blount, J., & Puntikov, N. (2007, January). Distr’huted m: Agile project ent with outsourced development t 7 40th annual Hawaii international conference (pp. 274a-274a). IEEE. https://ieeexplore.ieee.org/stamp/starmisp?arnumber=4076936&casa token=izD-Vz7JQIMAAAAA: ICyR-OiNZOgIAS532Mi4V7bD-ptTHtZ-a0H46 zUyIdYD-S1Lfp5IlyiEWZySbY5hzBEZSrQc8CtA&tag=1.
Nasir, M. (2006, June). A survey of software estimation techniques and project planning practices. In Seventh ACTS International Conference on Software Engineering, Artificial Intelligence. Networking, and Parallel/Distributed Computing (SNPD’06) (pp. 305-310). IEEE. https://ieeexplore.ieee.ora/stamp/stamp.ist,arnumber-1640709&casa token,J8QylfDibEAA AAA:Hcp3OaaNi wuFgD8d06g1DBFgFoaRbLMZFp9m1rHigOeDuy1mm6ROwaW88C7Nga 75 uFmtR4HmK9zA
• Oertig, M., & Buergi, T. (2006). The challenges of managing cross-cultural virtual project teams. Team Performance Management: An International Journal, 12(1), 23-30. httos://www.emerald.com/insight/content/doi/10.1108/13527590610652774/full/odf?title=t he-challenges-of-managing-crosscultural-virtual-project-teams
A quality proiect management bloq will be clearly articulated and professionally presented. It should demonstrate analysis, and a synthesis of content, knowledge, skills, and ideas acquired from lectures, tutorials and academic authors. It will include a well written introduction which catches the reader’s attention, sets the scope of the blog, indicates the aims of the blog, and provides an overall plan for the blog. The summary should include a brief outline of the main ideas of the paper. The analysis should explain both the strengths and weaknesses of the key arguments and should be supported by evidence. The conclusion should revise the main ideas and include clear implications of your findings.
‘ Federation University
Academic Presentation A
A
11
4 itech 7401 project management blog.docX