Brainstorming User RequirementsMarketing Research and Data Analysis
System Description: |
High Level Performance Requirements
(Reference process flow diagrams, process descriptions, etc.)
|
Performances/availability/accomplishments/feats/routines/tasks/etc.: |
|
Capacities/quantities/sizes/etc.: |
|
Number of users/batches/inputs/outputs/samples/etc.: |
|
Timings/durations/occurrences/etc.: |
|
Downtime/uptime/etc.: |
|
Operational Process Requirements
Functions
(List the functional requirements that enable the system to perform, such as)
|
Business: |
|
Process: |
|
Cleaning: |
|
Calculations / algorithms: |
|
Error handling: |
|
Technical /Automation and Control
|
Start–up requirements: |
|
Shutdown requirements: |
|
Failover requirements: |
|
Capacity requirements: |
|
Hardware Requirements: |
|
Software Requirements: |
|
Efficiency requirements: |
|
Interfaces
|
Interface with users: |
|
Interface with other equipment and IT systems: |
|
Environment
|
Layout: |
|
Physical conditions: |
|
Physical Security: |
|
Power requirements (UPS): |
|
Equipment Design
|
Construction Design: |
|
Services & Utilities: |
|
Materials of Construction: |
|
Material finishes: |
|
Lubricants: |
|
Environmental health & safety (EHSS): |
|
Access, Maintenance: |
|
Instrument Design
|
Tolerances: |
|
Calibration: |
|
Procedures: |
|
Tagging: |
|
Constraints
|
Compatibility issues with existing systems: |
|
Statutory obligations: |
|
System availability: |
|
Documentation requirements: |
|
Training: |
|
Maintenance: |
|
Ongoing support: |
|
Upgrades: |
|
Warranty expectations: |
|