Question 1

An M&E Engineer prepares the tender drawings (Figure Q1.1) for a hose reel and dry riser system. Briefly describe the scope of works of the fire protection system to be installed and illustrate the associated measurement rules and principles.

Question 2

Interpret Figures Q2.1, Q2.2, and Q2.3 in the Appendix and apply suitable measurement techniques to work out the bills of quantities to install electrical works for the transformer room and switch room.

Question 3

The Facilities Manager of a shopping center is planning to upgrade the existing CCTV system to an IP type of system. Therefore, the Facilities Manager has assigned the task to the engineer to prepare the documents to invite three contractors to submit quotations for the upgrading works. Prepare the itemized cost breakdown for the CCTV upgrading work and illustrate the associated measurement rules and principles.