MyKBS Academic ,r My Subjects .v
Home ) My Subjects > STAM4000 T1 2023 > Assessment 02 – Homework Exercises 2
Question 20
Not yet answered Marked out of 1.00 Flag question
Production managers, on an assembly line, must monitor the output to check if the level of defective parts is greater than an average of 5 per production run. They continuously inspect a random sample of production runs and find the average number of defective parts produced. If they find a significant increase in the mean number of defective parts, they will stop the assembly line and fix the machinery. The hypotheses are:
Ho: p = 5 Ha: p > 5 Say a random sample of 25 production runs is taken, where the mean number of defective parts is found to be 4.3 parts with a standard deviation of 0.5 parts. If testing at the 1% level of significance, what is the critical value? Please give your answer correctly rounded to two decimal place.
Answer:
Previous page
•
ng.kbs edu.au/rnod/quiziattempt.php?attempt=170343&cmici=3549048<page=20.
Finish attempt …
hool Pty Ltd. ABN 86 098 181 947. Registered Institute of Higher Education. PRV12094. CRICOS